Easier to Install
Easier to install and significantly less expensive
The commissioning process is incredibly fast. The IsaMill™ is considerably easier to install than a large high intensity mill, taking as little as four weeks on site.
At the same time, the Albion Process™ Leach Reactors can be commissioned. The result is that it’s taken as little as one team member six weeks to commission Albion Process™ and get operating.
The capital equipment required in the Albion Process™ is considerably less than what’s needed in alternative leaching processes.
It’s about half the cost of a traditional POx or bacterial leaching system.
The Albion Process™ doesn’t need pressure and so it doesn’t represent a risk of catastrophic failure or require the consequential rigorous statutory checking. The ZipaTanks™ are modular and fast to erect.