Main Corporate Website
-
XPS
-
Glencore Technology
-
Zipatank
-
Hypersparge
-
IsaKidd
-
IsaMill
-
IsaSmelt
-
JamesonCell
-
Albion Process
-
Viterra
-
Aquarius Energy
-
Glencore in South Africa
-
Glencore in the DRC
-
Mutanda Mining
-
Kamoto Copper Company
-
Astron Energy
-
Katanga Mining Limited
-
Glencore Australia
-
Viterra Australia
-
Bulga Coal
-
Liddell Coal
-
Mangoola
-
McArthur River Mine
-
Mt Owen Complex
-
Ravensworth operations
-
Ulan Coal
-
United Project
-
Wandoan Coal
-
West Wallsend
-
Murrin Murrin
-
Mount Isa Mines
Easier to Install
Easier to install and significantly less expensive
The commissioning process is incredibly fast. The IsaMill™ is considerably easier to install than a large high intensity mill, taking as little as four weeks on site.
At the same time, the Albion Process™ Leach Reactors can be commissioned. The result is that it’s taken as little as one team member six weeks to commission Albion Process™ and get operating.
The capital equipment required in the Albion Process™ is considerably less than what’s needed in alternative leaching processes.
It’s about half the cost of a traditional POx or bacterial leaching system.
The Albion Process™ doesn’t need pressure and so it doesn’t represent a risk of catastrophic failure or require the consequential rigorous statutory checking. The ZipaTanks™ are modular and fast to erect.